Sign In | Join Free | My chinacsw.com |
|
Brand Name : Dpack
Model Number : WJ250-2200
Certification : IOS9001
Place of Origin : China Hebei Dongguang
MOQ : 1 Line
Price : Negotiate
Payment Terms : L/C, T/T
Supply Ability : 1 Line/130 Days
Delivery Time : According to product
Packaging Details : Wooden case or wrapping film
Model No : WJ250-2200 7 ply corrugated cardboard production line
Design speed : 250m/min
Working speed : 220m/min(3 ply) 180-220(5 ply) 120(7 ply)
Working width : 2200mm
Main technical parameter and requirements of production line
Design speed | 250m/min |
Working speed | 220m/min(3 ply) 180-220(5 ply) 120(7 ply) |
Working width | 2200mm |
Flute type | according to the customer request |
The moisture rate of reel paper | 11%±1% |
Face paper | 120-200g/m2 |
Core Paper | 90-125g/m2 |
Liner Paper | 90-150g/m2 |
Corrugated paper | 90-125g/m2 |
Model No.:WJ250-2200 7 ply corrugated cardboard production line
1, Design speed:250m/min
2, Working speed:220m/min(3 ply) 180-220(5 ply) 120(7 ply)
3, Working width:2200mm
4,Note:The testing paper should as per below request when tested the production line
Reel–paper grade not less than B.
The moisture rate of reel paper:11%±1%
* Face paper: 120-200g/m2
* Core Paper: 90-125g/m2
* Liner Paper: 90-150g/m2
* Corrugated paper: 90-125g/m2
5, Flute type:according to the customer request can be choose as below:
6,Voltage: 380V 50Hz three-phase four-wire system(or as per clients country standard)
7,Equipment direction:Left or right transmission will be according to customer’s request.
8,Steam consumption: about 5500kg/h
Note:Customer’s self-provided part
1,Compressor main air pipeline and glue main pipeline
2,Electrical power supply, the wires for link to operate box and circuitry pipeline
3,Water source, water feeding pipeline and barrel
4,Groundsill plane installation project for water, electricity and air
5,For testing machines material,such as paper, corn starch, caustic soda and borax
6,The engine oil, lubricate oil, hydraulic oil, grease and high temperature lubricating
grease for equipment.
7,The food, hotel for technicians of installation and test. And provide some workers to
assist in installation.
8,Seller need to arrange at least 5 engineer to installation the machines.but
Buyer need to cooperate with our engineer
9,Buyer need to prepare the boiler 6 tons
![]() |